Site Installations
For examples of some of the type of projects we have done in the past for Site Installations include but not limited to:
HAMILTON CITY COUNCIL WASTEWATER TREATMENT PLANT
CLARIFIER MAIN BEARING REPLACEMENTS
Description of work;
- Project programming and management of sub-contractors.
- Removal and re-installation of 8t bridge.
- Jacking up of clarifier sludge collector arms.
- Replacement of main slue bearing.
- Re-assembly of clarifier mechanism and commissioning
HAMILTON CITY COUNCIL WATER TREATMENT PLANT
LOW LIFT PUMPS UPGRADE
Description of work;
- Project programming and management of sub-contractors.
- Cutting into main plant feed pipes and fit isolation valves.
- Fabrication and installation of carbon steel pipe work, 300NB–600NB.
- Installation of submersible pumps.
HAMILTON CITY COUNCIL WASTEWATER TREATMENT PLANT
BIO-REACTORS 1, 2, 3 AND 4 MECHANICAL UPGRADES
Description of work;
- Management of mechanical work and sub-contractors
- Removal of redundant pumps and pipe work
- Installation of new pumps and pipe work
- Design, build and install pump lifting cranes and monorails
- Replace inefficient non return flaps with actuated penstocks
WATERWORLD FACILITIES UPGRADE/RENOVATIONS
Description of work;
- Fabricate & install support structure/platforms for HVAC systems in 3 locations
- Fabricate & install stainless steel handrails
- Fabricate & install pipe support framework for HVAC piping
- Onsite gas cutting of pipe flanges and cutting steel in plant room
- Glazing wall strengthening
- Earth bonding solutions provided onsite
WAIKERIA PRISON POTABLE WATER UPGRADE
Description of work;
- Installation of Sand Filters and storage tank
- Fabrication and installation of stainless-steel pipe work
- Installation of valves and actuators
AVALON DRIVE DAY CARE
NEW OUTDOOR PLAY AREA
Description of work;
- Fabricate & install new galvanised steel portal frames
- Fabricate & install new galvanised steel stair stringers
- Fabricate & install new galvanised steel stair balustrades
- Fabricate & install new galvanised steel perimeter balustrades and gates
PORTER PROPERTIES – STEEL PLATE INSTALLATION
Description of work, all done onsite;
- Cut D16 rebar to 100mm length
- Install steel plates with mag drilling into 8mm plate and drilling into concrete.
- Chemset rebar into concrete
- Rebar plug welded to the 8mm plate